News
The ship Liberdadi returned to service today, 24 September
CV Interilhas informs that the ship Liberdadi has successfully completed its mandatory dry-docking, carried out following the incident of 21 April, and has obtained the corresponding certification from the Class and the Cape Verde Flag, in line with international standards of safety, reliability and operational quality.

The ship is now operational and began its first voyage today, sailing from São Vicente to the island of São Nicolau.
With this return, the Liberdadi now fully operates the Operating Model of the Redonda Line (São Vicente – São Nicolau – Sal – Boavista – Santiago and back) and the Triangular Line (São Vicente – São Nicolau – Santiago – São Vicente), replacing the ship Dona Tututa, which will begin its mandatory dry-docking under the statutory requirements of the Class and the Flag.
CV Interilhas thanks all its staff for their dedication and professionalism throughout this process and acknowledges the availability and cooperation of CABNAVE and the maritime institutions, which made a decisive contribution to getting the ship ready.
TIMETABLE UPDATE ON THE REDONDA AND TRIANGULAR LINES – LIBERDADI
Due to the operational characteristics of the Liberdadi, a faster ship, the timetables of the sailings following departure from the island of São Vicente will be adjusted.